PRACTICE SCHOOL - I
 

    A few projects completed by students at theirrespective PS-I stations are listed below:

 

S_No.

PROJECT TITLE

1 Resource Planning For Non-Stock Items
2 Database Systems
3 A Report On Study Of ISO 9002 And Internal Quality Audits
4 A Report On Training Module
5 Enterprise Resource Planning
6 Exchange Of Information Within Organisation
7 Cnc Programming For Turning Operations
8 A Report On Maintenance Of Data
9 A Market Survey On Alternators
10 Closed Loop Speed Control Of D.C. Motors
11 Market Survey Of A.C. Motors
12 A Report On Closed Loop Speed Control Of D.C. Motors
13 A Report On Product Management (Profitability)
14 Study Of The Commercial Department
15 Report On Spring Manufacture, Coupler Assembly, Project Planning And Execution
16 Quality Control Practices In Foundries
17 Water Tube Boilers
18 Organizational Study In Texmaco Ltd.
19 Welding- An Integral Part Of Production In Texmaco
20 Development Of A Web Site For Texmaco
21 Power Supply In Texmaco And Electrical Equipment In An Industry
22 Supplier Consolidation For Effective Cost Reduction
23 Machine Capability Study And Measurement System
24 A Report On Tightening Torque
25 Analysis Of Alternators And Starters
26 A Report On Improving Tool Life
27 A Report On Statistical Process Control
28 Study Of Algorithm For The Quantitative Determination Of Paper Formation
29 Vibration Measurement Using Optical Techniques
30 Preliminary Studies On Fruit Sorting Systems
31 Artificial Neural Networks In Match Prediction
32 A Report On Preparation, Characterization And Application Of Styrene
33 Data Retrieval Using Oracle 7
34 Microbial Degradation Of Butyric Acid In Association With Sulphate Reduction
35 Chromatographic Analysis Of Sulphomethylated Products Of Phenolic Compounds
36 Web Site Design And Data Base Integration
37 C Program For A Finch And Dobby Scale-Up Model
38 Beneficiation Of Baryte
39 A Report On The Software Developed To Register Customer Complaints
40 Documentation Of Electrics (Machine Drawings)
41 Software For Ordering Of Sketches
42 Standard Time Calculation For Marking Process
43 A Report On Kcp Limited And Core Concept In Quality Control